dear all,
can you please detail what is the purpose of revaluation measure date specified in AUFW?
I checked that is the date by which the asset is to be revaluated, but this is informed in ABAWN or AR29N, as the reference field date.
Please give examples if possible, with this date as the beggining of the year and as the end of the year.
thank you!