Hi Kishore:
Thanks for your help. The basis is that I want to use to split the settlement of a internal order in as many ítems as source primary cost. I was told that it was done in a Project in US and I would like to try it. I know that I could use an allocation structure but the option with the exit, if possible, could be more automatic and I would prefer it. That's how we can avoid to créate a long allocation structure.
Thanks again
Jose