Hello Pankaj.
We are facing a similar upgrade scenario with SAP ECC5 and Oracle DB version: 9.2.0.6
Did you manage to do the upgrade correctly? Was the strategy correct?
Our problem is if it is possible to upgrade the Oracle database version to 11g from the export in version 9.2.0.6 after the UC conversion tasks and import it later in an Oracle 11g (newly installed from scratch) and after that do the post unicode conversion activities.
Thanks in advance.
Best regards,
Iñaki Larrañaga.