Hi MHP,
In case you have activated the Expiration Date Check in OMJ5 for your plant and movement type 101, this is what will happens when you do a confirmation:
- If you have maintained the fields Total shelf life and Min.Rem.Shelf life in the material master (plant data / stor 1), then the system will ask to enter the manufacturing date and SLED (Expiration date) will be not editable and will be determined baded on your material master settings.
- If you have NOT maintained any of the fields Total shelf life and Min.Rem.Shelf life in the material master (plant data / stor 1), then the system will not ask for the manufacturing date and/or SLED (Expiration date). Both fields will be empty.
- If you have maintained the field Min.Rem.Shelf life (only this field and not Total shelf life) in the material master (plant data / stor 1), then the system will ask to enter the SLED (Expiration date) and the Manufacturing date will be not editable.
If you want to enter both fields, in this case you will need to try with a user exit or BAdI. The code of the user exit or BAdI will need to use the function "POPUP_TO_CONFIRM', this way you will be able to enter your date.
Kind Regards,
Mariano